Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/shuyengban.com/httpdocs/wp-includes/functions.php on line 6121
Home Page Slides Information – SHUY Eng Ban (PhD)

Brief Information on Home Page Slides

Slide 1:

Studies carried out by me for the spillway, downstream release structure and tunnel outlet dissipation structure of the Nam Theun II Hydropower project in Laos. Picture shows bed scouring and erosion protection for the tunnel outlet structure.

Slide 2:

Studies carried out by me for the holding pond, off-take structure and flood gates and energy dissipators of the stormwater components of the SMART (Stormwater Management and Road Tunnel) project in Malaysia. Picture shows the intake structure into the flood tunnel.

Slide 3:

Studies carried out by me for the Nikilat Ship Repair Yard, Qatar. Picture shows air entraining vortices entering drainage channel at low water level during emptying of the dock.

Background Picture:

Sg Ulu Pandan in Singapore designed by me as a natural looking waterway with grassed berms and jogging tracks along its banks