Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/shuyengban.com/httpdocs/wp-includes/functions.php on line 6131 Past Projects – SHUY Eng Ban (PhD)
C823-LTA Circle Line Stage 2 – Hydraulic design for temporary kingposts (2003)
Network and surge analyses for Newater Pipelines to Loyang and Changi areas (2003)
Hydraulic design of temporary diversion drain for culvert across Airport Boulevard (2003)
Flood risk study for Pelton Canal (2003)
Surge Study for Ang Mo Kio Sewerage Pumping Stations (2003)
Surge Study for Ringwood Sewerage Pumping Stations (2003)
Surge Study for Teck Hock Sewerage Pumping Stations (2003)
Technical review of hydraulic report by MARIN (Maritime Research Institute Netherlands) (2003)
Surge study for Tembusu and Merlimau Pumping Stations (2003)
Technical review of damage to swimming pool floor slab (2003)
Surge study for Penjuru Pumping Station (2003)
Surge study for Wholesale Centre Pumping Station (2004)
Hydraulic Analyses for kingposts in Pelton diversion canal (2004)
Hydraulic Analyses for temporary cofferdam across Sg Kallang (2004)
Hydraulic Analyses for temporary cofferdam across Rochor Canal (2004)
Hydraulic Analyses for temporary staging along Geylang canal (2004)
Hydraulic Analyses for diversion drain across Airport Road (2004)
Hydraulic Analyses for diversion drain near Paya Lebar road (2004)
Review of drainage improvement work at Sports Recreation Centre NUS (2004)
Hydraulic Model Study – Flood diversion canal for Canal City Development (2004)
Hydraulic Model Study – Bah Soon Pah Pumping Station (2004)
Surge Study – Wholesale Centre Pumping Station (2004)
Review of surge pressures and thrust block loading on pumping mains at Airport road (2004)
Surge Study – Jalan Bahar Pumping station (2005)
Dambreak Flood Study for PUB (2005)
Anchor loading for cooling pipes Marina Centre (2005)
Hydraulic Model Study – Nam Theun II Hydropower-Nam Khatang spillway (2005)
Hydraulic Model Study – Nam Theun II Hydropower-Downstream Release Structure (2005)
Hydraulic Model Study – Nam Theun II Hydropower-Tunnel Outlet Dissipation Structure (2005)
Reconstruction of Mountbatten Road Bridge across Geylang River – Hydraulic Study on Effects of Installing Temporary Kingposts and Bore Piles across Geylang River (2005)
Physical Hydraulic Model Testing of Proposed Inlet System for Seri Johor Flood Detention Project (2005)
Hydraulic study of swimming lagoon at Manado Indonesia (2006)
Hydraulic Model Study – Nam Theun II Hydropower-Downstream Channel Restitution Structure (2006)
ABC Western Catchment master plan programme (2006, member of a team)
Development of Dambreak flood information management system for PUB (2006)
Twin 900 mm Diameter NEWater Pipelines from Changi WRP to Bedok WRP : Surge Analysis (2006)
Marina Raw Water Pumping Station : Pump Sump Hydraulic Model Study (2006)
Surge Study : Main Station of Pulau Keppel (2006)
Surge Study : 2.2 m Marina Raw Water Pumping Mains (2007)
Pump Sump Hydraulic Model Study : Punggol-Serangoon Pumping Station (2007)
Surge Study : Punggol-Serangoon Pumping Station (2007)
Surge study – Kranji Newater Factory Phase 2 (2007)
Hydraulic Model Study – Upper Pedas Hydroelectric Power Project – Sabah (2007)
District cooling pipes hydraulic loadings Marina city (2007)
Sg Kemasin river mouth improvement works (2007)
Surge Study: Influent Pump Station, Astana Water Supply and Sewage Project, Kyrgyzstan (2007)
Surge Study: Discharge Pump Station, Astana Water Supply and Sewage Project, Kyrgyzstan (2007)
Surge Study: Temporary Influent Pump Station, Astana Water Supply and Sewage Project, Kyrgyzstan (2007)
Surge Study: Temporary discharge Pump Station, Astana Water Supply and Sewage Project, Kyrgyzstan (2007)
Hydraulic Model Study: Nikilat Ship Repair Yard, Qatar (2008)
Hydraulic Model Study: Ma’aden Phosphate Project, Saudi Arabia (2008)
Review of breakwater design for Sg Kemasin river mouth improvement works (2009)
Review of Physical Hydraulic Model Stud y for Sg Kemasin river mouth improvement works (2009)
Corporation Road Pumping Station – Surge Study (2009)
Updating of rainfall intensity-duration-frequency curves for storm drainage design for PUB (2010)
Design of rainwater harvesting, bioswale system, and water sensitive urban design for Digital Telecommunication Project At Shah Alam, Selangor, Malaysia (sustainable drainage) (2010)
Pilot Well Pumping Test on Jurong Island for PUB (2010)
Biotope system for water quality management at Bishan Park (2010)
Check adequacy of surge vessels and commissioning of surge vessels for 2.2 m Marina Raw Water Pumping Mains (2010)
Expert Witness: Alleged water damage to third party property (Corona Ville) on 19 November 2009 (2010)
Climate Change Coastal Inundation Risk Map Study for Singapore (2011, member of a team )
Surge Study for Rasuna Water Treatment Plant Intake Structure (2011)
Surge Study for Improvement Works as Changi Water Reclamation Plant (2011)
Bioswale design for Bunga Rampai Estate Upgrading (2011)
Bioswale design Phoenix Estate Upgrading (2011)
DTL Stage 3 Contract 937 Singapore River Diversion Scheme Pre-Tender Hydraulic Study (2011)
Drainage design works for extension of Jurong Island reclamation works (2011)
Bedok Newater Factory: Siphon problem of reject pipe main (2011)
Bioswale design Charlton Park Estate Upgrading (2011)
Bioswale design Lorong Melayu Estate Upgrading (2011)
CFD modelling of treated water pump sump for Niroth Production Facilities, Cambodia (2011)
CDF Modelling: Upgrading of Kranji II Pumping Station, Singapore (2011)
Physical Model Study: Upgrading of Kranji II Pumping Station, Singapore (2011)
Surge Analysis: Upgrading of Kranji II Pumping Station, Singapore (2011)
Derivation of hydrological curves for PUB’s WSUD design guidelines for PUB (2011)
Surge Analysis for treated water pump sump for Niroth Production Facilities, Cambodia (2011)
Hydraulic Study: Up-heave of Geylang River bed due to jet grouting (2011)
Hydraulic Study: Temporary king posts in Geylang River (2012)
CDF Modelling: Upgrading of Pandan Reservoir Pumping Station, Singapore (2012)
Physical Model Study: Upgrading of Pandan Reservoir Pumping Station (2012)
Surge Analysis: Upgrading of Pandan Reservoir Pumping Station, Singapore (2012)
Hydraulic Study of Effluent Outfall System of Ulu Pandan Water Reclamation Plant (2012)
Surge Analysis for Pumping System at Choa Chu Kang Town (2012)
CFD Modelling of Used Water Lift Station for JWRP (2012)
Physical Model Study for Diler Power Plant Sea Water Pumps Turkey (2012)
Surge Study for Jurong Town Hall Lift Station (2012)
ABC Project for Sg Kallang St Andrews node (2012)
Dambreak Flood Analysis and Development of a Dambreak Database Management for PUB (2012)
Surge Analysis for 1200 mm raw water main from Lower Seletar Reservoir to Bedok Reservoir/Woodleigh Waterworks (2012)
Hydraulic analysis, sump model study, surge analysis, determination of pumping system curve and pump duty points and strucutral assessment for pumping operation at Bedok reservoir pumping station (2012)
Hydarulic Physical Model Study for upgrading of Bukit Timah Waterworks Pumping Station (2013)
Drainage design works at Changi Airport (2013)
Surge Analysis for pumping station at Ayer Merbau Jurong Island (2013)
CFD modelling of SMUF Cooling Pumping Station Jurong Island (2013)
Surge Analysis for pumping station at Penjuru Road (2013)
Expert Advice: Sludge Pumping Problem (2013)
Surge Analysis for JTC raw water pipe within WENYA (2014)